Previous Posts

Jul 2016 24

Wiring and lacing

Mt Adams continues in leaps and bounds...

Last update on Mt Adams, I had been busy with paper mache. Since then the whole lot has had a good coat of browny paint from our top secret strategic stockpile of test pots. The double crossover has been mounted and I've designed some laser-cut servo-based point motor mechanisms that are recessed into the plywood base (so they don't foul the polystyrene scenery base).

The upper station has had its track laid, as has the upper tunnel.

Yesterday I finished placing all the remaining trac...

Read full post...
Jul 2016 22

Not trains

A bit quiet on the blogging front, but not for lack of progress...

Yes after a brief jaunt down to Christchurch for a quick holiday, I am back and the coffee table has once again succumbed to glue bottles and paint tins and little bits of cardboard. Mrs A is very tolerant!

Wildcat

The Wildcat that I have been quietly working away on has now been completed. I gave it a good spray of silver Tamiya paint, then left it alone for a month. The other day I decided to test out Indian Ink for weathering and reached for the Wildcat. I mixed up a weak mix of ink and isopropyl alcohol and washed it on the model. This nicely brought out the panel lines. Then I used the dregs to loosen up some dried up paint on the bottom of my paint tray and washed that on too. Finally I did a third wash of Indian Ink and IPA, but this time something interesting happened. The IPA loosed up the acrylic paint mix from before, and when rubbed with a finger tip, it went a...

Read full post...
Jul 2016 5

The COBOL building

A slight detour as I build something of a "tribute" to one of my favourite blogs...

Recently while reading 30 Squares of Ontario, JD's FORTRAN building popped up. I've always admired the building; something about its shape and simplicity. Plus I liked the name. So I decided to build my own interpretation of it; helpfully, JD included his drawings and enough dimensions that I could easily make my own in N scale.

After a quiet evening with Inkscape (plus a little Ruby scripting to generate randomly opened window blinds) I came up with my working drawings:

I have my workflow nicely set up now, so that black lines are c...

Read full post...
Jun 2016 30

Experimenting with laser cut bricks

A slight diversion today as I experiment with making laser cut bricks.

Laser cutters are great at cutting things out. Especially square things, and things with sharp edges. I've tried making bricks and other textures on the laser cutter before, however the width of the beam is so incredibly fine that the mortar lines are impossible to paint.

So today I experimented instead with the "raster 3d" setting on my laser cutter, which takes in an image, and everything black is cut at 100%, and white is cut at 0%, and greys are cut at varying power levels.

By loading in a brick pattern like so:

... and choosing the raster 3d setting in Visicut, I managed to cut some nicely textured bricks.

I tried many different techniques to detail them, but this one works the be...

Read full post...
Jun 2016 26

Paper mache time

Mt Adams lurches back into high gear again...

Trackwork

Believe it or not but the double crossover is now complete!

I've cut the electrical gaps in the right (I hope) places, and it passes the multimeter tests. All that is left is to solder on the the throw bars and glue it down!

Fascia

After deciding to make the fascias after doing the scenery, I proceeded to change my mind and make them first. With so many tunnels though, I needed a way of getting inside them to clean track, rescue trains, etc. So I needed some little access panels. Now I could painstakingly cut them out by hand, however with a high power laser sitting in town, it was obvious which way I would go! So last Friday I popped down w...

Read full post...
Jun 2016 5

Double crossover progress

Mt Adams continues...

Progress may have slowed, but I'm still moving forward. My double scissor crossover has had a few more rails soldered in place. It is slow fiddly work, but as long as I measure everything five times and cut very carefully... well so far no mistakes.

That said, I have had to desolder a few rails and file off a bit more to make point blades sit nicely, but that is ok. So to sum up...

Point blades: 4/8 made. Check rails: 3/8 made. Diamond rails: 1/4 made. Diamond check rails: 0/4 made.
Read full post...