Jun
2016
26
Paper mache time
Mt Adams lurches back into high gear again...
TrackworkBelieve it or not but the double crossover is now complete!
I've cut the electrical gaps in the right (I hope) places, and it passes the multimeter tests. All that is left is to solder on the the throw bars and glue it down!
FasciaAfter deciding to make the fascias after doing the scenery, I proceeded to change my mind and make them first. With so many tunnels though, I needed a way of getting inside them to clean track, rescue trains, etc. So I needed some little access panels. Now I could painstakingly cut them out by hand, however with a high power laser sitting in town, it was obvious which way I would go! So last Friday I popped down w...