workbench update

Nov 2014 24

Sanatorium progress - the final sprint

The saga of the Sanatorium continues...

More sanding, more painting

Just when I thought I'd done enough, I had still more painting and sanding to do! The final stage of it though. After sanding everything smooth I had to paint the top black to prevent any light seeping through.

You can see that, for some reason, the bits that I filled with baby-epoxy-powder have a different look to those that are just styrene!? Easily fixed with a few more coats of white, finished off with some white Vallejo acrylic airbrushed on for a nice uniform finish. End result is very smooth and white looking!

Read full post...
Nov 2014 24

Sanatorium progress - the end is nigh!

The saga of the Sanatorium continues...

Quietly over the last few months I've been plodding away on the insanitorium. In the month of July, I clamped one of the layers to my CNC machine and very slowly cut out a circle. My CNC machine isn't really cut out for machine wood, and so it was a slow and noisy process.

Despite pinning it to the bench, the piece kept breaking free or otherwise moving. After that I invented a better method of clamping the Dremel to a saw horse and pivoting the workpiece at the right radius; made the job much quicker!

After that I proceeded to, in a series of fits and starts, build more of the cursed thing over the coming months. The typical process was: stare at it for a month; do three hours work on...

Read full post...
Nov 2014 2

Modular building, part 3

My modular building project continues on from part 2... 

Nearly two months since the last update! Gosh. Now that the spring warmth has arrived, there is a lot to do in the garden. Combine that with numerous other small jobs and building a new laundry, there hasn't been much time for blogging. I haven't been idle though, just nothing of much note has been happening. Then there was the entire week that I spent debugging and fixing the electronics after I sent 15VDC down the RS485 bus by mistake. Took out most of the ICs in the system with it. Sigh!

Anyway, late in August I gave the whole building a zap with black primer.

This helps stop any light leaking through from the inside. It looks pretty racy all ...

Read full post...
Sep 2014 9

Modular building, part 2

My modular building project continues on from part 1...

Construction

Once I had all the components, construction proceeded very quickly. I made a wall at a time, using lots of bracing on the back, and sections of 0.75 x 0.75mm styrene trim on the front to tidy up the corners.

The bracing on the back made joining together the corners pretty easy.

While shopping at our local discount asian warehouse I came across some rather neat miniature wooden clothes pegs that I knew would make great clamps:

Read full post...
Sep 2014 7

Modular building, part 1

I'm building a new building for Ranuska, a small hotel by the seaside. Of course, it has to be interesting and a little different, and I'm trying out some new techniques too.

INspiration

My inspiration for this build comes from a few places. First is a residential building from Bobrujsk, Belarus, from the Soviet Modernism era of architecture:

Closely related to this is the Nakagin capsule tower, built in the 1970s in Tokyo:

 

(Read a

Read full post...
Aug 2014 10

Funicular is GO!

An exciting milestone in Ranuska was reached tonight: the sanatorium funicular successfully completed a return journey from bottom to top, and back down again!

The Utrainia News Agency was on hand to capture the moment:

Still a few bugs to iron out, but a very exciting moment for all Ranuskan's. More details to follow...

Read full post...